Additional lorry loads at rendering plant

In deciding that it would be appropriate to allow an increase in the amount of animal waste processed at a meat rendering factory an inspector decided that additional measures to mitigate noise and disturbance to residents were also required.

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits