Aviation mitigation scheme unworkable

In deciding not to permit the erection of a 102 metre high wind turbine in Lincolnshire an inspector expressed dissatisfaction as to the manner in which its impact on the radar systems operated by three RAF bases could be mitigated.

by

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits