Boilers burn at new waste-to-energy plant

A £300m landmark waste-to-energy project has cleared a big hurdle in its commissioning process after two boiler lines were fired up for the first time.

Aerial image of the Ferrybridge Multifuel 1 facility taken in March. Picture: Wheelabrator
Aerial image of the Ferrybridge Multifuel 1 facility taken in March. Picture: Wheelabrator

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

Prices on request

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits