Built form reduction fails green belt redevelopment

The demolition of two dwellings together with motor trade workshops to facilitate a comprehensive redevelopment for four dwellings in the Surrey green belt was refused despite the appellant claiming that it would result in a lower level of built development.

by
100-075-182 (Image Credit: Tandridge DC)
100-075-182 (Image Credit: Tandridge DC)

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits