Changes to design of Drakelow renewable energy plant approved

Derbyshire County Council has approved changes to the design and extended the duration of an energy from waste power station on the site of the former Drakelow C plant in the river Trent valley, near Burton upon Trent.

by Ruth Amundson

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 4025

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits