Deletion of a condition on a wood-fuelled energy plant

An inspector decided that a condition which had been imposed on a planning permission for a 9MW wood-fuelled energy plant on Humberside was overly restrictive in requiring all waste wood to be sourced from within Hull and East Yorkshire if it were to be delivered by road.

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits