Energy plants set for three Seneca landfill sites

Biogas generation company ENER-G has signed a deal to build three energy recovery facilities at landfill sites operated by Seneca Global Energy which in total will generate 3.8MW of electricity.

by
ENER-G Natural Power has partnered with Hartlepool-based Seneca Global Energy to generate up to 3.8 megawatts of renewable electricity at three UK landfill sites
ENER-G Natural Power has partnered with Hartlepool-based Seneca Global Energy to generate up to 3.8 megawatts of renewable electricity at three UK landfill sites

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits