Grundon and Viridor lodge updated EfW plans

Grundon and Viridor have submitted a revised application for an energy-from-waste (EfW) facility, along with a waste sorting and transfer station at Ford Circular Technology Park.

by Maxine Perella
The proposed EfW plant would have an annual capacity of 295,000 tonnes and generate 28MW of energy (Photograph: Grundon)
The proposed EfW plant would have an annual capacity of 295,000 tonnes and generate 28MW of energy (Photograph: Grundon)

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 4025

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits