Heathrow plans doom EfW plant

Recently announced plans for a third runway at Heathrow Airport will mean demolishing and replacing a major, award-winning energy-from-waste plant and recycling facilities.

Lakeside EfW will be demolished to make way for the third runway. Picture: Lakeside
Lakeside EfW will be demolished to make way for the third runway. Picture: Lakeside

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

Prices on request

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits