Hotel location fails sequential approach to site selection
Permission for the erection of a 98 bedroom hotel in Bath was denied because alternative and more sequentially preferable sites existed.
Permission for the erection of a 98 bedroom hotel in Bath was denied because alternative and more sequentially preferable sites existed.