Huge wind farm docks at Kishorn

A dry dock with quarry is to come out of a 23-year-long hibernation to be used to make concrete structures for the the world's largest floating wind farm.

by Jez Abbott
Kishorn dock is being pumped dry ahead of the work starting. Picture: Kishorn Port
Kishorn dock is being pumped dry ahead of the work starting. Picture: Kishorn Port

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 4025

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits