New quarry conditions approved despite officer regret at scope of process
An application involved the first periodic review of two mineral permissions on one site. One permission was for the extraction and processing of sand and gravel which was granted on the 11th November 1991 and the other permission was for the extraction of sand and gravel with restoration to agricultural use both at low level and at existing level using waste silt and imported waste which was granted on the 22nd April 1996.
