Peel Environmental submits plans for plastics-to-hydrogen plant

Peel Environmental has submitted plans to build a £7m waste plastic-to-hydrogen facility at its Protos site near Ellesmere Port in Cheshire.

by Maxine Perella
The facility at Peel's Protos site will use gasification technology to convert plastic waste to hydrogen
The facility at Peel's Protos site will use gasification technology to convert plastic waste to hydrogen

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 4025

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits