Policy - Industry body attacks system over delays in plan production

The Mineral Products Association (MPA) has warned that failures in the current planning system could inhibit recovery of the development and construction industry and the mineral products sector.

by
Underbuild in housing: planning system must adapt to deal with demand during the recovery (Image credit: Owen Price)
Underbuild in housing: planning system must adapt to deal with demand during the recovery (Image credit: Owen Price)

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits