Protos plastic-to-hydrogen project completes FEED phase

Peel L&P Environmental’s waste plastic-to-hydrogen project has taken a step forward following completion of the front-end engineering design (FEED) phase.

by Maxine Perella
The waste plastic-to-hydrogen developed is expected to cost £20m
The waste plastic-to-hydrogen developed is expected to cost £20m

Sign in to continue

Sign In

Trouble signing in?

Reset password: Click here

Email: mineralplanning@haymarket.com

Call: 0208 267 8120

Register
FREE

  • Limited free articles a month
  • Free email bulletins

Register

Subscribe

From £42 a quarter

  • Full access to mineralandwasteplanning.co.uk
  • Exclusive event discounts
  • Mineralandwasteplanning print magazine
  • Plus lots more including our State of the Industry Report.

See all benefits