Turbine rejection but meteorological mast secured

A proposed wind turbine with a maximum height to blade tip of 100m was dismissed in Cumbria due to its overbearing impact on the outlook of some local residents. A meteorological mast was secured for a maximum period of three years.

Subscriber content. To view it please sign in below or  subscribe

Or log in to DCP Online or Compass Online

Please enter your details

Forgotten Password?

Having trouble signing in?

Contact Customer Support at
mineralplanning@haymarket.com
or call 0208 267 4025, or refer to our answers to frequently asked questions.

Subscribe to Mineral Planning or Waste Planning

Subscribe Now

or Sign up for a free trial