Waste authority awards contract
North London Waste Authority has confirmed a contract to manage the waste collected by seven boroughs at a new 700,000 tonne per year energy-from-waste (EfW) plant.
North London Waste Authority has confirmed a contract to manage the waste collected by seven boroughs at a new 700,000 tonne per year energy-from-waste (EfW) plant.